A site measure is the last chance to catch a problem before it's cut. The plans say the wall is 3600. The room says 3584, the floor drops 12 mm across the run and the plumber put the waste 200 mm left of where the sink goes. This checklist is the order that keeps those things from reaching the factory.
Before you go
- The latest plans and elevations, with the revision letter. Old plans are the most common cause of a wrong measure.
- The model numbers of every appliance the client has chosen: oven, cooktop, rangehood, fridge, dishwasher, microwave. Download each installation manual. The cavity sizes and clearances in the manual win over anything general.
- The client's selections: benchtop material and thickness, handle or handleless, kickboard height, overheads to the ceiling or not.
- A tape, a laser if you use one, a level (a 1200 mm level or a laser line), a pencil, and a phone or iPad for photos.
1. Walls first, from one fixed corner
Pick one corner and measure every wall as a running dimension from it, not as separate bits added together. Small errors add up when you chain them; a running dimension carries one error at most.
- Measure each wall at three heights: near the floor, at bench height (about 900) and near the ceiling. Walls are rarely the same length top and bottom.
- Write down the smallest. That's the one the cabinets have to fit.
- Check the overall length against the sum of the parts. If they don't agree, find out why before you leave.
- Check corners for square. On an L or U, measure the diagonal, or mark 300 and 400 from the corner and check for 500 (3-4-5). Note which way it's out and by how much.
- Check walls for plumb with the level. A wall leaning out at the top changes overhead depth and scribe allowances.
2. Heights and the floor
- Ceiling height at both ends of every wall, and in the middle of long runs. If overheads go to the ceiling, this decides the cabinet heights.
- Find the high point of the floor along each run and shoot a level line (a datum) from it. Base cabinets are set from the high point, and the kickboard takes up the difference.
- Note how much the floor falls across the run. More than the adjustable legs allow means packing or a taller kick.
- Is the floor finished? If tiles or timber are still to go down, get the finished thickness and allow for it.
- Bulkheads, cornice and skirting: height, depth and which walls they're on.
3. Openings
- Windows: distance from your fixed corner to each side of the frame (and architrave), sill height from the floor, head height, and how far the sill sticks out from the wall.
- Doors: the same, plus the swing direction and whether the door or its handle clears an end panel or a tall cabinet.
- Anything that opens into the kitchen: sliding doors, pantry doors, a fridge door that hits a wall.
4. Services
Every service gets two numbers: its distance from your fixed corner and its height off the floor. A photo with the tape in shot is worth taking too.
- Power points (single or double), data, switches and light points.
- Cold and hot water, and waste. Note if the waste comes out of the wall or up through the floor.
- Gas point, and the type (natural gas or LPG).
- Floor wastes, vents, meter boxes, downpipes boxed into corners.
- Anything that has to move to suit the design. Tell the builder or client in writing before you leave.
5. Appliances and clearances
- Check every appliance against its cavity size in the installation manual, including ventilation gaps for fridges and integrated ovens.
- Gas cooktops: for new kitchens, the clearance from the top of the trivet to a rangehood or any downward-facing combustible surface is at least 650 mm under AS/NZS 5601.1:2022, unless the cooktop or rangehood manual asks for more. The greater number applies.
- Side clearance: if a vertical combustible surface (an overhead side, a tall cabinet, a timber splashback) is closer than 200 mm to the edge of the nearest burner, it has to be protected. Many manuals ask for more.
- Dishwasher next to the sink, with room for the hoses. Check the drawer or door beside it clears the handle.
- Rangehood: ducted or recirculating, and where the duct goes.
6. Photos and sign-off
- Take a photo of every wall straight on, plus every service close up with the tape showing.
- Go over the sheet once more before you leave. Every wall has a length, both ends have a ceiling height, every service has two numbers.
- Mark anything you couldn't measure, and anything you guessed, as unchecked. A guessed number that looks like a measured one is how mistakes get made.
Common mistakes
- Measuring from plans instead of the room.
- Measuring walls once, at one height.
- Forgetting the finished floor or the tiled splashback thickness.
- Services measured from the nearest wall instead of the fixed corner, so nobody knows which wall.
- Using the old 600 mm gas clearance on a new kitchen.